Tabor61 Condos
234 NE 61st Avenue, Portland
-
Fifteen-Unit apartment building in Mt. Tabor. Construction to begin in November 2022. Units to be built to hold as long-term rentals.
-
Nine 2BR/1BA units, Six 1BR/1BA units. 11,200 s.f. building.
-
Builder: Summit Design Contractors, Architect: HM Group, Civil Engineering: TCC & Associates, Structural Engineering: Nava Contracting & Engineering, Surveyor: Centerline Concepts, Legal: Chris Scott, Financing: Alera Group
-
$3.3M project cost, $4.8M completed value.